Explore UAB

A series of images from the UAB Archives
UAB campus continues to expand, 2002
March 2024 Image of the Month

A crane on 20th Street (left center) marks the construction of the medical school's Faculty Office Tower, which was built on top of the existing parking deck located between 5th and 6th Avenues.  The building was completed in 2003 and in 2023 was renamed as the Lyons Harrison Faculty Office Tower.  Two other cranes (right background) mark the construction of the North Pavilion addition to the University Hospital complex.  The 11-story North Pavilion was completed in 2004 as the largest building ever constructed at UAB.  The multi-story white building (lower center) was the Parliament House Hotel, a landmark on Birmingham's Southside neighborhood for decades.  The Parliament House was opened in 1963 and was demolished by UAB in 2008 for continued campus expansion.

Image ID: P17.1.28, #0123

 

Mervyn H. Sterne Library

917 13th St S
Birmingham, AL

(205) 934-6364

Lister Hill Library of the Health Sciences

1700 University Blvd
Birmingham, AL

(205) 975-4821

Reynolds-Finley Historical Library

1700 University Blvd - 3rd Floor
Birmingham, AL

(205) 934-4475

Alabama Museum of the Health Sciences

1700 University Blvd - 3rd Floor
Birmingham, AL

(205) 934-4475

Lister Hill Library at University Hospital

615 18th Street S - P235 West Pavilion
Birmingham, AL

(205) 934-2275

801 Building

801 5th Ave South
Room 1111
Birmingham, AL

(205) 934-5432

J. Ellis Sparks Medical Library

301 Governors Drive SE - 3rd Floor
Huntsville, AL 35801

(256) 551-4405

Back to Top